
Belgian Offshore Days (from 2019-03-20 to 2019-03-21) will be hosted by Belgian Offshore Cluster at the historical Wellington Racetrack in Ostend.
![[:en]DEU, Merkur Offshore Windfarm Installation Start[:pt]Merkur Offshore Windfarm Installation Start[:fr]Merkur Offshore Windfarm Installation Start[:]](http://endiprev.dev.loba.pt/wp-content/uploads/2018/02/Merkur-Offshore-GmbH-windfarm-installation-start.jpg)
Endiprev was selected for the commissioning of a 66 unit (396 MW) windfarm in Germany.

Endiprev was selected to perform the commissioning of the Fujian Xinghua Gulf demo project. The project is constituted by 3 units of the GE Haliade 150 6MW wind turbine.

The first offshore wind farm in the United States, 30-megawatt composed by 5 GE Haliade 150-6MW turbine, in Block Island Wind began commercial operations in December 2016.
Endiprev is supplying technical support and commissioning service for Alstom’s Haliade 150 Prototype near Saint-Nazaire, France.